[1]
Effendi, M.S. et al. 2020. Pengaruh Perbedaan Nilai Risk Priority Number Failure Mode And Effects Analysis Terhadap Mechanical Availabilty Unit Mining Truk HD785 Series. POROS TEKNIK. 12, 2 (Dec. 2020), 59–65. DOI:https://doi.org/10.31961/porosteknik.v12i2.1031.