ANALISIS METODE BIAYA PERAWATAN HAUL TRUCK DENGAN SISTEM KONTRAK PADA PT “ABC” BANJARMASIN

Authors

  • Teguh Suprianto Politeknik Negeri Banjarmasin
  • Hermansyah . Politeknik Negeri Banjarmasin

Abstract

Maintenance system contracts all this time was popular. It because of marks sense that
perception mantenance model with system contract precious been looked on by heavy equipment
owner. Therefore needs to be done by count outgrows maintenance cost with system contracts
with notice reliability of heavy equipments.
In this analysis will be worked through about whatever parameters that is used to determine
maintenance cost haul truck with system contracts and how methodic to account maintenance
cost with system contracts that effective so can compete and advantages owner and also agent
party. In cost count contracts to be accounted by expectation point full scale downtime
equipment up to one period so gets to be determined by expectation of penalty cost. From
expectation Corrective Maintenance and Preventive Maintenance hereafter will be
determined expectation of the cost contracts.

Downloads

Download data is not yet available.

How to Cite

Suprianto, T., & ., H. (2016). ANALISIS METODE BIAYA PERAWATAN HAUL TRUCK DENGAN SISTEM KONTRAK PADA PT “ABC” BANJARMASIN. Jurnal INTEKNA : Informasi Teknik Dan Niaga, 10(2). Retrieved from https://ejurnal.poliban.ac.id/index.php/intekna/article/view/242

Issue

Section

Articles